Shin-Ei-Kiko Co, 148 Mould, Double Headed Flatware Roller Making Machine, Typical Run Rate 8 Items/Min
Shin-Ei-Kiko Co, 152 Moulds Double Headed Versatile Roller Making Machine, Typical Run Rate 6 Items/Min
Zeidler Machine & SAMA Dosing Pugmills, 140 Moulds, Double Headed Roller Machine Suited to Mugs and Small Bowls, Typical Run Rate 12 Items/Min
Zeidler, 156 Moulds, Double Headed Roller Machine Suited to Bowls and Small Plates, Siemens S5 Control System, Typical Run Rate 10 Items/Min
Service Engineers Ltd, 75 Moulds, Single Headed Roller Machine Designed for the Production of Cups and Mugs Typical Run Rate 8 Items / Min
Service Engineers Ltd, 79 Moulds, Single Headed Roller Machine Designed for the Production of Cups and Mugs, Typical Run Rate 8 Items / Min
VSM Metalworking, Large 16 Station Turntables, Automated Glaze Spraying Machine for Plates and Medium Sized Bowls, Typical Run Rate 12 Items / Min, Full System Overhaul in 2020
Drayton, Tunnel Kiln (60m x 3.5m x 1.8m), 1300 Degrees Celsius, Nozzle Mix Burners, Mitsubishi PLC.
Zeidler, Packaging Lines Consisting of Loading Conveyor, Rotary Foot Polishing Turntable for Flatware Items, Complete with Back Stamp Printing Station, Barcode Applicator and Palletizer Typical Run Rate 9 Items
And Much More
Subject to Availability
Removal
Removal Deadline Friday 11 September 2026, 4:00pm BST
Removal Hours: Monday 3 August – Friday 11 September 2026, 9:00am – 4:00pm BST. Srictly by Prior Appointment and Excluding Weekends
Collection is only permitted once a paid in full invoice has been received
The Buyer and or their removal contractor must supply their own lifting equipment Method statements and risk assessments, copies of all relevant insurances documents and operator licenses must be supplied and approved ahead of any item being dismantled or moved in accordance with Health & Safety policies. Site attendance for the duration of the removal process to be confirmed and agreed in advance
Anyone attending site will be required to wear the relevant PPE workwear including Hi-Viz Vest/Jacket and Safety Footwear.
Terms and Conditions
Buyer’s Premium of 18% will be applicable to this sale
VAT at 20% will be added to the total price and Buyer’s Premium. Purchasers from overseas should note that the VAT on the Buyer’s Premium is not recoverable
All payments must be cleared in our account by Monday 3 August 2026, 12:00pm BST
All Lots must be collected by Friday 11 September 2026, 4:00pm BST
All persons arriving on site must report to the entrance and complete the signing in procedure book
This site is a full PPE area and everyone must comply whilst the site is designated as such. PPE worn must comply with all relevant Method Statements. Anyone not found wearing his/her PPE will be required to leave the site, if in doubt assistance must be sought from the site Supervisor